CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile

Product Details
Customization: Available
Connector Type: Type 2
Start Mode: APP Control, RFID Card
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
ODM Services
The supplier provides ODM services
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (25)
  • CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile
  • CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile
  • CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile
  • CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile
  • CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile
  • CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Certifications
  • Case Show
  • FAQ
Overview

Basic Info.

Model NO.
ANACE1-230V/32A
Location
Public Use
Installation
Wall Mounted
Charge Method
Normal Charge
Input Power Connection
3pH+N+PE(L1,L2,L3,N,PE)
Charging Connector
Type 2*1
Rated Power
22kw
Certification
CE+CB
Transport Package
Carton Packaging
Specification
285*150*410mm
Trademark
AONENG
Origin
China
HS Code
850440
Production Capacity
10000

Product Description

Product Description
 CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging PileCCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile

 

Product Parameters
Input power connection
3Ph + N + PE(L1, L2, L3, N, PE)
AC input voltage
400 VAC ± 10%
AC input frequency
50/60 Hz
Rated operating current
16 A (3P)
Charging connector
Type 2(3P)
Rated power
11 KW
Over-voltage protection
253 VAC
Input under-voltage protection
207 VAC
Output over current protection
35.2 A
Leak current protection
Type A(30mA)+ 6 mA(DC)
Cable length
Nominal 3.5 meters
HM Interface
4.3 inch LCD Touch screen
Signal indicator
Standby : steady white light
Plug in: steady purple
Charging:shining blue light
Charging completed: steady green light
Alarming: steady red light
Safety standards
IEC 61851
Back-end Communication protocol
OCPP 1.6
RFID system RFID
ISO 14443A, MIFARE DESFire Ev1
Internet connection
4G ,Ethernet,Wi-Fi (Optional)
Energy meter
EU MID Approved Energy meter
Certification
CE
Dimension
285*150*410mm(W*D*H)
Weight
8kg
 
Certifications

 

CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile
Case Show


CCS Gbt IP66 Commercial Fast AC EV Charger Charging Station Charging Pile

FAQ

Q:   Are you the factory or trading company?
A:      We are factory with more than 20 years in the field of DC power supply solution,  traction power supply and new energies. We warmly welcome you for the visit.

Q:   How is the delivery time?
A:      Generally, the delivery time between 7-30 days after getting client's payment. For accurate info depends on the products and the quantity, we can make further communication on this.

Q:  Do you have MOQ requirements?
A:     MOQ 1 PC,besides,we have more than 100 technicans to fully meet with customized requirements.

Q:  How long to fully charge a car?
A:      To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.

Q:   Can you provide customized service?
A:      Yes. we have been getting involved with the OEM and ODM projects since 2004. So that we can provide professional customized service for our clients.

Q:   Do you have after sales service?
A:      Yes, we have the after-sales service team. Our after-sales engineer Can give the support and instruction by video or phone call while needed.

Q:   Do you make the test after finishing production?
A:      Yes, our production engineer team will do the test while goods finished, and we will prvoide the test info to clients for reference before delivery.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier