Product Description
Product Parameters
Shell material |
galvanized sheet |
Input power connection |
L+P+PE, 3P+N+PE |
Input frequency |
50/60Hz |
Rated power |
3.5KW*2 |
7.5KW*2 |
11KW*2 |
22KW*2 |
Rated voltage |
230Vac, 400Vac |
Rated current |
16A*2 |
32A*2 |
16A*2 |
32A*2 |
HMI |
4.3 inch touchscreen |
Charging method |
standard: plug ang charge, swipe the card;
optional: QR code, APP |
Networking mode |
4G, WIFI, Ethernet (optional ) |
Operational platform |
support OCPP 1.6 protocol |
RCD |
Type A (30 mA)+ 6mA (DC) |
Charging connector |
Type 2 (dual guns) |
Cable length |
3.5 m (optional ) |
Operating temperature |
-30ºC~+55ºC |
IP rating |
IP 65 |
Dimension |
345*255*1200 mm (W*D*H) |
Installation method |
floor standing |
Certifications
Case Show
FAQ
Q: Are you the factory or trading company?
A: We are factory with more than 20 years in the field of DC power supply solution, traction power supply and new energies. We warmly welcome you for the visit.
Q: How is the delivery time?
A: Generally, the delivery time between 7-30 days after getting client's payment. For accurate info depends on the products and the quantity, we can make further communication on this.
Q: Do you have MOQ requirements?
A: MOQ 1 PC,besides,we have more than 100 technicans to fully meet with customized requirements.
Q: How long to fully charge a car?
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.
Q: Can you provide customized service?
A: Yes. we have been getting involved with the OEM and ODM projects since 2004. So that we can provide professional customized service for our clients.
Q: Do you have after sales service?
A: Yes, we have the after-sales service team. Our after-sales engineer Can give the support and instruction by video or phone call while needed.
Q: Do you make the test after finishing production?
A: Yes, our production engineer team will do the test while goods finished, and we will prvoide the test info to clients for reference before delivery.