180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station

Product Details
Customization: Available
Connector Type: CCS2
Installation: Floor Type
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
ODM Services
The supplier provides ODM services
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (25)
  • 180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station
  • 180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station
  • 180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station
  • 180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station
  • 180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station
  • 180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • Product Parameters
  • Certifications
  • Case Show
  • FAQ
Overview

Basic Info.

Model NO.
ANDCE1-180KW/1000V-Y11
Number of Charging Interfaces
One Pile with Multiple Charges
Start Mode
Credit Card Payment, Mobile Remote Operation, RFID Authentic
Input Power Connection
3pH+N+PE(L1, L2, L3, N, PE)
Charging Connector
CCS2*2
Rated Power
180kw
Cable Length
Nominal 5 Meters
HMI
7 Inch LCD Touch Screen
Signal Indicator
Green (Power), Red (Charging), Orange(Fault)
Connector Standard
IEC 62196 (Combo CCS 2)
Safety Standards
En 61851-23: 2014 & En 61851-1: 2010 IEC 61851-1:
EMC Standards
IEC 61851-21-2: 2018
EV Compliance
DIN 70121 / ISO 15118
Back-End Communication Protocol
Ocpp1.6
Internet Connection
4G / Ethernet (Ethernet)
Certification
CE
Dimensions
750 (W)× 750 (D) × 1800 (H) mm
Weight
405kgs
Transport Package
Wooden Case Packing
Specification
750 (W)*750 (D) *1800 (H) mm
Trademark
Aoneng
Origin
China
HS Code
850440
Production Capacity
60000 PCS/Year

Product Description

Product Description
 

180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station
180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station

Our Advantages

 

180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station

 

Product Parameters
Product Name  90kw/120kw/150kw/180kw Ev Dc Fast Charging Station Ev Charger Ccs Ev Charger With 7 Inch Lcd Screen
Input power connection
3Ph + N + PE(L1, L2, L3, N, PE)
AC input voltage
400 VAC ± 10%
AC input frequency
50 / 60 Hz
Power factor
0.98 (full load)
Efficiency
95% (full load)
Rated power
90kW       120kW       150kW       180kW
Rated input current
130A        175A          220A          260A
Maximum output current
200A        200A          200A          200A
Output voltage
200 ~ 1000 VDC
Cable length
Nominal 5 meters
HMI
7 inch LCD Touch screen
Signal indicator
Green (power), Red (charging), Orange(fault)
Connector Standard
IEC 62196 (Combo CCS 2)
Safety standards
EN 61851-23: 2014 & EN 61851-1: 2010
IEC 61851-1: 2017
EMC standards
IEC 61851-21-2: 2018
EV Compliance
DIN 70121 / ISO 15118
Back-end Communication protocol
OCPP 1.6
RFID system
ISO 14443A, MIFARE DESFire Ev1
Internet connection
4G / Ethernet (Ethernet)
Certification
CE
Dimensions
750 (W)× 750 (D) × 1800 (H) mm
Weight
405kgs

 

Certifications

180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station
 

Case Show

180kw Double Gun Charging Pile Free Standing EV Car Fast Charging Station

FAQ

Q:   Are you the factory or trading company?
A:   We are factory with more than 24 years in the field of new energy. We warmly welcome you for the visit.

Q:   How is the delivery time?
A:   Generally, the delivery time between 7-30 days after getting client's payment. For accurate info depends on the products and the quantity, we can make further communication on this.

Q:  Do you have MOQ requirements?
A: MOQ 1 PC,besides,we have more than 100 technicans to fully meet with customized requirements.

Q:  How long to fully charge a car?
A: To know how long to charge a car, you need to know the OBC(on board charger) power of the car, the car battery capacity, the charger power. The hours to fully charge a car =battery kw.h/obc or charger power the lower one. For e.g, the battery is 40kw.h, obc is 7kw, charger is 22kw, the 40/7=5.7hours. If the obc is 22kw, then 40/22=1.8hours.

Q:   Can you provide customized service?
A:    Yes. we have been getting involved with the OEM and ODM projects since 2004. So that we can provide professional customized service for our clients.

Q:   Do you have after sales service?
A:    Yes, We provide 2 years warranty for our clients.we have the after-sales service team. Our after-sales engineer Can give the support and instruction by video or phone call while needed.

Q:   Do you make the test after finishing production?
A:   Yes, our production engineer team will do the test while goods finished, and we will prvoide the test info to clients for reference before delivery.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier